Views: 1
1. Billet preparation: The raw material, usually a solid round billet, is inspected for any defects and surface imperfections, and then heated to the required temperature for forming.
2. Piercing and rolling: The heated billet is pierced to create a hollow shell, and then it is rolled to the desired outer diameter and wall thickness.
3. Sizing and cooling: After the initial rolling, the pipe is further rolled and sized to achieve the final dimensions, and then it is cooled to room temperature.
4. Straightening and inspection: The cooled pipe is straightened to remove any deformations, and it undergoes various inspections and tests to ensure quality and conformity to standards.
5. Cutting and finishing: The seamless steel pipe is cut to the required length and then undergoes surface treatment, such as pickling or coating, to protect against corrosion.
6. Final inspection and packaging: The finished seamless steel pipe is thoroughly inspected for any defects, and then it is packaged and prepared for shipment to the customer.
Hunan Gaoxing Steel Development Zone, No.1888 Purui South Rd, Wangcheng District,Changsha, Hunan, China
Tel: 0086-0731-88678598