Home
Engineering Structure

Tubing used for piling construction for project

Description: Tubing used for piling construction for project less than 100m depth. With concrete poured into tubing body as support foundation.
Product Name: Tubing
Specification: 88.9*11*6000mm; 114.3*11*6000mm, J55/N80Q/P110
Quantity: 2000Tons
Country: Korea
Year: 2016

 

OLD MANDURAH TRAFFIC BRIDGE REPLACEMENT in WA

Description: OLD MANDURAH TRAFFIC BRIDGE REPLACEMENT in WA
Product Name: Long piling with end plate,driving shoe
Specification: AS1579 / AS3678 Grade 350 L0
450x10x20000mm/15000mm
610x16x8000mm/24000mm
Quantity: 114 Lengths
Country: Australia
Year: 2016

HOT PRODUCT

QUICK LINKS

CONTACT US

  Hunan Gaoxing Steel Development Zone, No.1888 Purui South Rd, Wangcheng District,Changsha, Hunan, China

Tel: 0086-0731-88739521

  inquiry@threewaysteel.com