Views: 3
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) | |||||
Outside Diameter | Wall Thickness | FOB TIANJIN | Outside Diameter | Wall Thickness | FOB TIANJIN |
外径 (mm) | 壁厚 (mm) | 离港价 USD/TON | 外径 (mm) | 壁厚 (mm) | 离港价 USD/TON |
219、245 | 5.0-11.75 | 579.54 | 462 | 5.75-11.75 | 598.96 |
273 | 5.0-11.75 | 579.54 | 12.5-13.75 | 605.43 | |
12.5-13.75 | 586.01 | 457、478 | 5.75-11.75 | 611.90 | |
299 | 5.5-11.75 | 579.54 | 12.5-13.75 | 618.37 | |
12.5-13.75 | 586.01 | 14.5-17.75 | 624.85 | ||
325 | 5.5-11.75 | 579.54 | 508 | 5.75-11.75 | 611.90 |
12.5-13.75 | 586.01 | 12.5-13.75 | 618.37 | ||
355 | 5.5-11.75 | 598.96 | 14.5-17.75 | 624.85 | |
12.5-13.75 | 605.43 | 529/559/610/630 | 5.75-11.75 | 624.85 | |
377 | 5.75-11.75 | 598.96 | 12.5-13.75 | 631.32 | |
12.5-13.75 | 605.43 | 14.5-17.75 | 637.79 | ||
406 | 5.75-11.75 | 598.96 | 660 | 7.5-11.75 | 644.26 |
12.5-13.75 | 605.43 | 12.5-13.75 | 650.73 | ||
/ | / | 14.5-17.75 | 657.21 | ||
Note: | |||||
1. The above price is based on BARE pipe, for extra coating, please contact us; | |||||
2. The above price is based on FOB TIANJIN; | |||||
3. The above price is NOT including any packing and end processing charge, for detailed quotation; | |||||
4. The above price is only valide during October 17-24; | |||||
5. The applicapable MOQ for this price list is over 25 tons; |
Hunan Gaoxing Steel Development Zone, No.1888 Purui South Rd, Wangcheng District,Changsha, Hunan, China
Tel: 0086-0731-88739521